04 October 2009

Benchwork construction, part 14

Yet another post on the benchwork construction but this is the first in english.

Today I've added the third benchwork section of the lower level. Still missing are the pulleys to lift this section and the bracing to support the horizontal iron beams that made the main framework of the benchwork.

Now this section is laying on top of the two folding brackets that keep it lifted in the "up-position". As soon as I can find an electrical drill powerful enough make holes in the concrete ceiling I'll fix the pulleys to the ceiling and get the rope through the two legs pulleys of this section and the benchwork will be done. At least the first level.

Some new photos to better show the current status soon.

See you soon...

No comments: